Tracking gas safety and EICR dates across a portfolio: a practical setup
Every managed property comes with a set of dates that can't be missed. The gas safety check is due every year. The electrical installation needs inspecting at least every five years, or sooner if the last report says so. Each certificate has to reach the tenant within a set time. Across a portfolio of a few hundred properties, that is a lot of dates, a lot of contractors and a lot of emails.
Most agencies already have these dates somewhere: in the property management system, a spreadsheet, a contractor's portal or an inbox. The problem is rarely knowing the rule. It's making sure every property gets booked in time, every engineer gets access, every certificate comes back, and every tenant gets their copy. That follow-through is where automation helps.
This guide covers England. Rules differ in Scotland, Wales and Northern Ireland.
The dates that matter
Gas safety
Under the Gas Safety (Installation and Use) Regulations 1998, landlords must have gas appliances and flues they provide checked every 12 months by a Gas Safe registered engineer. HSE guidance says:
- existing tenants must get a copy of the gas safety record within 28 days of the check
- new tenants must get a copy before they move in
- records must be kept for at least two years
Since 2018, the check can be carried out up to two months before it's due while keeping the original expiry date. In practice, that means booking 10 to 12 months after the last check. Book earlier than that and the clock resets.
Electrical safety (EICR)
The Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020 require landlords to have the electrical installation inspected and tested by a qualified person at least every five years, or at the shorter interval the last report specifies. Government guidance says landlords must:
- give existing tenants a copy of the report within 28 days of the inspection
- give new tenants a copy before they move in
- give the local council a copy within 7 days of a written request
- complete any remedial or further investigative work the report requires within 28 days, or sooner if the report says so
- give the tenant and the council written confirmation within 28 days of that work being completed
The remedial-work deadline is the one most likely to slip, because it depends on a second visit, a second contractor and a second piece of paperwork.
Alarms on the first day of a tenancy
The Smoke and Carbon Monoxide Alarm (England) Regulations 2015, as amended in 2022, require landlords to check that the required smoke and carbon monoxide alarms are working on the day a new tenancy begins. It's a single date rather than a renewal, but it belongs in the same checklist.
Where the process usually breaks
The legal duties sit with the landlord, but on managed properties the agent usually runs the process. Common failure points:
- the expiry date is in one system and the contractor booking happens in another
- engineers can't get access and nobody rebooks quickly
- the certificate comes back by email and isn't filed against the property
- the tenant's copy isn't sent, or nobody can prove it was
- EICR remedial items are noted but not tracked to completion
- the landlord isn't told about remedial costs until late
Each of these is an administrative gap, not a knowledge gap. That's why they suit automation.
What can be automated
1. One register of due dates
The automation can build and maintain a single register: each property, each certificate type, the last check date, the next due date and the booking window. For gas, that window is 10 to 12 months after the last check. For EICRs, it's driven by the next inspection date on the latest report. If your property management system offers an API or export, the register can be filled from it rather than retyped. Reapit (through Reapit Foundations), Alto and Arthur Online, for example, all publish developer documentation, but what you can connect depends on the product and your subscription, so it needs checking for your setup.
2. Booking prompts and contractor requests
When a property enters its booking window, the automation can draft a request to your contractor and a message to the tenant asking for access, for a person to approve or for sending automatically if you're comfortable with that. If the tenant replies with times, the reply can be summarised for whoever confirms the booking.
3. Chasing access and missed appointments
Failed access is a big cause of late checks. The automation can spot a missed appointment from the contractor's email, log it, and prompt a rebooking the same day. It can also keep a dated record of each attempt to gain access, which helps show the reasonable steps taken.
4. Reading certificates when they arrive
AI is good at reading a returned gas safety record or EICR and pulling out the key facts: property, date of check, outcome, next due date and any defects or remedial codes. It can file the document against the property and update the register. Anything unclear, such as an unsatisfactory result or a date it can't read, goes to a person.
Illustrative example: an EICR arrives with a remedial item. The automation files the report, sets a 28-day deadline from the inspection date, emails the property manager with the item listed, and drafts a note to the landlord asking for approval of the quote. When the contractor's completion certificate comes back, it reminds the team to send the confirmation to the tenant and the council.
5. Getting copies to tenants, with proof
Once a certificate is filed, the automation can send the tenant their copy and keep a record of when it was sent. HSE guidance says the gas safety record can be given electronically if the tenant is happy with that, though a paper copy must be provided if they ask.
6. A weekly compliance view
A short weekly summary for each property manager: what's due in the next 60 days, what's booked, what's overdue, what's waiting for a certificate and which remedial items are open. The same view can be shared with landlords.
What must stay with people
Safety decisions
If a gas engineer marks an appliance as immediately dangerous, or an EICR identifies danger, a person needs to handle it straight away. An automation can make sure that report reaches the right person immediately. It must not decide what happens next.
Contractor choice and landlord approvals
Which contractor to use, whether to approve a remedial quote and how to deal with a landlord who won't pay for works are decisions for your team and the landlord.
Difficult access cases
When a tenant repeatedly refuses access, the next step is a conversation, not another automated email.
Interpreting the rules
If you're unsure whether a property, an appliance or a tenancy is in scope, check current guidance or take advice. Automation enforces the process you set. It doesn't decide what the law requires.
Data and access
Tenant contact details, access arrangements and certificates are personal data. Before connecting anything, be clear about what each part of the workflow can see, where documents are stored, whether any AI provider can retain the data and who can view the logs. A sensible design gives the automation only the access it needs and keeps documents in your existing systems.
Where to start
Start with gas safety alone across one branch or one portfolio. Build the register, turn on booking prompts and certificate filing, and check every outgoing message for the first month. Then add EICRs and remedial-work tracking, which is where the most chasing tends to sit.
Questions we often hear
Do we need new compliance software to do this?
Not necessarily. Many agents already pay for systems that hold these dates. The automation connects what you already use, where those systems allow it, and fills the gaps between them: the inbox, the contractor and the tenant.
Can it book engineers automatically?
It can draft and send booking requests and access messages, but we usually recommend a person confirms bookings at first. How far it goes depends on how your contractors take bookings.
What happens if a certificate shows a dangerous result?
The automation flags it to a named person straight away and does nothing else on its own. What happens next is a decision for your team and the landlord.
The honest summary
Gas safety checks, EICRs and the deadlines around them aren't complicated. Keeping track of them across hundreds of properties, contractors and tenants is. Automation can hold the dates, prompt the bookings, read the certificates, send tenants their copies and keep a record of each step. Safety decisions, contractor choices and difficult conversations stay with your team.
To see how this fits with the rest of a lettings operation, read AI automation for letting agents and our guide to maintenance triage, or email luke.sewell@melonjuice.ai.
This article is general information about England, not legal advice. Check current HSE and GOV.UK guidance for your obligations.
Email us or read how we work with letting agents, see how a project runs, or use the contact form